Grand Tortue Ahmeyim for BP: first rock shipment in Nouakchott (Mauritania)

These materials are transported on a 17-hectare platform built within the Autonomous Port of Nouakchott Port de l’Amitié (PANPA) where, since January 11th, they have been loaded, at a rate of 30,000 tons per rotation, onto the Simon Stevin vessel, which will convey them to the hub 10 km off the Mauritanian-Senegalese coast. 


Post a Press Release


Browse Top 1000 Lists


There, “Rock Installation” operations will make it possible to build the foundation of the breakwater on which the 21 concrete caissons will be placed. 

To be continued…


More from: | Category: Construction Company News